933 880 890
EXTERNAL QUALITIES
Structure and façade
  • Structure of reinforced concrete with reticular wrought.
  • Brick façade combined in some areas with different materials, according to the project.
Community area standards
  • Landings and granite stairs.
  • Approved standard elevators with automatic doors.
Exterior windows and doors
  • Aluminium frames with “climalit”double glazing or similar.
  • Automated aluminium blinds.
  • Latticed aluminium enclosed utility rooms.
Exterior woodwork
  • Wooden, reinforced front door with natural varnish finish with security lock.
  • Wooden interior doors with “Block” style natural varnish finish.
INTERIOR STANDARDS
Flooring and tiling
  • Parquet throughout the apartment.
  • Kitchen: Porcelain finish flooring, with enamelled ceramic tiling.
  • Terraces and utility rooms also tiled with porcelain finish.
  • Main bathroom: Porcelain finish flooring and tiling.
  • Second bathroom: Porcelain finish flooring, with enamelled ceramic tiling.
Paintwork
  • Plain white plastic paint on walls and ceilings.
KITCHENS
  • Upper and lower cupboards with layered finish and stainless steel handles.
  • Worktop in granite, 2 cm in thickness.
  • Stainless steel sink by Roca or similar brand.
  • Vitroceramic hob by Balay or similar brand.
  • Electric oven stainless steel by Balay or similar brand.
  • Filter assembly stainless steel by Balay or similar brand.
  • Pre-installation plumbing for washing machine and dishwasher.
BATHROOMS FINISHES
Main bathroom
  • Designer wall unitby Roca or similar brand.
  • Bath by Roca or similar brand.
  • Single-lever mixer taps by Grohe.
  • Towel radiator.
  • WC, bidet.
Second bathroom
  • Designer wall unit by Roca or similar brand.
  • Bath or shower depending on the apartment type.
  • Single-lever mixer taps by Grohe.
  • Towel radiator.
  • WC, bidet.
ELECTRICITY AND COMMUNICATIONS
Communications
  • Installation for telephone socket.
  • Installation for land and satellite arial.
  • Video door phone.
Heating and hot running water
  • Combi boiler with natural gas, for hot water and heating.
  • Hot water tank generated by solar panels.
Interior dividing walls
  • Ceramic partition walls between rooms inside the apartment.
  • Ceramic separation walls between apartments, in stair wells with approved standard sound-proofing.
  • Complete electrical installation, including individual protection panels, main trip switch, thermo-magnetic diferential and earthing, general circuits, switches, base sockets and light points.
  • Water installation in accordance with current regulations of the Distribution Company of Badalona, with the main tap and other taps in bathroom and kitchen areas.
  • Gas installation in accordance with basic standards of the Supplying Company, with the main tap.
  • Pre-installed air conditioning (cold air only) in the dining room.
Insurance
  • The building has an obligatory insurance policy of Ten-YearGuarantee, covering all structural elements.
Quality control
  • Quality control of building materials.
PAINTWORK
  • Plain white plastic paint on walls and ceilings.
Back

Utilizamos cookies analíticas, técnicas, propias y de terceros para ofrecer un servicio de gran utilidad y evaluar el rendimiento del mismo con el fin de mejorar tu experiencia como usuario. Puede usted aceptar estas cookies haciendo clic en “Aceptar y seguir navegando” o si desea más información haciendo clic en “Más información”.